I want to say the whole thing went smooth but the beginning was rocky. My husband couldn't go because he had to work so it was just me and my 3 year old son. Had I known it would take 4 hours I would have packed him a lunch. He got kinda crazy toward the end, the the PM took him outside to play so I could finish up (which I appreciated!).
I will preface this that I LOVE our SR and our PM seems like a totally great guy and someone I look forward to working with. The things that happened were things that corporate changed and failed to notify the SR and the PM. None of these things were the fault of them as we had to spend time making calls and figuring a few things out.
A little on our background:
We just accepted a job here and it was not a paid move. We had to move from PA to SC with less than 30 days notice. When we signed our contract, they told us we would have a June 1 delivery date. That's 2 months. So we put 85% of our stuff in storage, are living with the bare minimum in the only apartment that would rent to us for 2 months. oh, and with a 3 year old and a dog.
So when they told us they are looking at a June/July delivery date now, I almost cried. It may seem dramatic but we are not from here, so it's not like we are already comfortable here. We are actually living in a small town 20 min away from where our new house will be. And I was not preparing for most of our stuff to be locked up for nearly 4 months. And our apartment is not nice by any means. Well unless you like cooking and doing laundry right next to each other. Yes, our washer is right next to our stove. awesome.
They knew I was disappointed and the only answer they had was that home sales are booming right now and they are having a hard time getting materials. So apparently once we get the permits, then we go into a pot of people and spin around until our number gets called. Hmm.
Then, we started going over the house plans, a few things were missing. Cue disappointment number 2. We were promised by the SR to get the top of the line crown moulding, and wainscoting in the formal living room. I guess there was confusion over that and we only are getting the crown moulding and chair rail (wainscoting was a $1695 upgrade). Whatever. I guess I kinda felt annoyed that the SR had told me multiple times we were getting that, then to find out we are not, and her not even have a solution for me (or even just give it to me for free!) was irritating. So I lost that battle.
One other thing was the paint. As you know the Divine White is the only "white" they have and it's more of a yellow/tan. I have been bothered about this from the beginning and the only solution I was offered was "we will paint the ceilings white but everything else has to be Divine White". When I asked how much that would be she said "oh, not much". So I said ok. Um yeah. So when we start going through and talking about paint, I said how much was that upgrade and she said "$1290" to which I responded "take it out". When we are deciding whether or not to add a $200 light, then obviously $1290 is a lot to us so yeah, not going to work. I did find my peace about this as I went back in the main office of the model to see Divine white and I think if a dark color is painted next to it, it will look white. I'd just have to steer clear of any colors that are too light as they will showcase it's yellowness. And if we have to paint the ceiling...so be it.
One other issue. If you get a morning room, apparently it doesn't come with an overhead light. Without a morning room, the dinette area has a chandelier. With a morning room, you get nothing. So I asked "you mean to tell me I spend $9k on a morning room and don't get any type of overhead light or chandelier for free?" They ran some numbers and were able to get it for me, but yes I did have to pay for it.
Other than that, we had a fun time going through everything. I had to correct a few areas, they had the wrong siding and shutter, were missing the extra master window (and I highly recommend getting that if you are getting a Florence with morning room. The peak on the morning room forces the windows upstairs to be moved right next to each other and when we walked thru the Florence model, it was dark on the side with no window. Having a window there was a must for us.)
Then we went up to the lot and he showed us what will happen. We have some trees on our lot but they all have to be removed. Bummer but they aren't at the back of the lot, they are at the middle right where the morning room will sit. Our lot sits higher than both the lots on either side which is kinda cool. Love love love the lot.
Back to the sales office to discuss final numbers. We made one last phone call to upgrade our carpet padding upstairs. We ended up just about $10k over what we wanted to spend but since our interest rate is so low, we are just going to go with it. It's only about an $85 increase a month from where we wanted to be and at this point there was just nothing else we could get rid of happily. We have already settled on it all.
Oh and one more thing, we decided to upgrade the 10x12 slab to a 10x19 which will extend the patio all the way to the end of the family room. It will basically fill up the rectangle at the back of the house from the morning room over. It was $6/ft to do it, so it was about a $420 upgrade but I think it was worth it to get that extra slab for a bigger table and nice BBQ.
And about the financing. I have not been all to pleased with our loan officer who has not once called me throughout this process and I feel like I have to pull information out of her. Looking at our closing costs estimate... I almost fainted at the fact that all the money we put in would be going toward closing costs. However after digging around and talking to the SR I realized you can choose a different rate and not pay points and there are ways around paying so much at closing. So we are going to look at our options but we really planned on getting that money back since our house will need a fence, a fridge, a dining room table, a couch....and then some.
I have noticed some people list pricing and I know it's different in every state. I think it is the cheapest here, we are in north west South Carolina. I will list just so we can see the difference in the upgrade prices! And coming from PA I have been pleasantly surprised at the cost of living down here!
Florence $145,900
morning room $7,995
extra windows morning room $995
extra window master bedroom $495
gourmet island $2,495
granite on gourmet island $695
hardwood on entire bottom floor except laundry was around $10,000
tile in laundry room $175
carpet padding upgrade $695
carpet upgrade $695
premier VI appliances $3,995
concrete pad upgrade to 10x19 $420
cabinet upgrade butterscotch maple $3,295
bathroom cabinets upgrade $600
fireplace upgrade to stone $700 (fireplace with slate was free so we had to pay the difference)
upgraded garage door to carriage style $595
homesite premium $2,500 (toward the end of cul de sac, and needed tree removal)
overhead light in formal living $200
chandelier in morning room $195
gas range $275
tile upgrade master bath $1,295
tile upgrade secondary bath $220
secondary light on the outside of garage $298
Things that came free with the 65th anniversary package:
-Hardwood in foyer ($225)
-Hardwood in powder room ($200)
-42" wall cabinets ($595)
-granite in kitchen ($1,690) does not include island upgrade
-Feature III Microwave ($995)
-Owners bathroom full upgrade to glass shower ($2,590)
-6x6 tile surround Master Bath ($195)
-Double Bowl vanity Master ($695)
-Chair Rail and crown moulding ($995)
-kitchen/bathroom cabinet hardware ($200)
-slate fireplace ($2,595)
-overhead lighting Progress Bravo package ($600)
-concrete patio 10x12 ($780)
-kitchen faucet upgrade ($295)
-Elevation B siding veneer ($1,895)
-kitchen cabinet crown moulding ($595)
Total included upgrades: ($15,140)
Also, the house comes with sod on the entire lot, and a minimal landscaping package in the front bed, as well as a tree in the front yard.